Water Regs Remedial Works

Pipework Up-Grade

CMS installed a new integrated water management system into a large manufacturing site outside Sunderland.

This was a direct consequence of an inspection by Northumbrian Water which required the site to up-grade their water management systems to meet the prevailing water regulations. This involved the installation of a new water storage tank with a Type AB Air Gap. The initial pipework had been classified as a Category 5 Fluid Risk.

Leave a Reply