County Hotel Carlisle – Gas Catering Installation

CMS conducted a full gas catering installation at the County Hotel Carlise, one of the most presitgious hotels in the area.

It suffered from sub-standard infrastructure with potential compliance issues and no interlock system.

CMS installed a gas interlock controller, gas solenoid, emergency stop buttons and pipework all upgraded and to standard.

The project was delivered on time and on budget and the client was delighted with the quality of the work. Having taken advantage of Lockdown 2.0 there was minimal disruption to normal operations.