Case Study: Boldon Post Office Heating System Renewal

Customer Profile

CMS was contracted by one of our major clients, a nationwide facilities management company, to update the heating system within a large combined office/warehouse facility in the North East, a 1980’s building, which operates 7 days per week.

Before

After

REQUIREMENTS

The heating system had previously been served by two aged gas heating boilers, one of which had failed and was now unserviceable and obsolete. Due to persistent issues with the remaining serviceable boiler CMS were approached and asked to quote to replace and up-grade both boilers with ‘minimal to no impact on the occupants of the property’.  Deadlines were extremely tight given the approach of winter.

SOLUTION

The CMS projects team designed and specified an upgraded, highly efficient system for the clients building.  The project was delivered by the Gas North team and consisted of the complete strip out of the existing boilers and replacement with new units, the installation of a new gas header and flue as well as the reconfiguration and re-insulation of much of the existing pipework.  The main equipment installed was:

  • BROAG Remera Heating Boilers
  • Magna-clean filters
  • Pressurisation unit
  • Various valves; gas solenoid valve, isolation valves, RPZ valve, etc.
  • Various heating circulation and booster pumps.

The project was completed for the client within budget and well ahead of schedule within 2 weeks, with the client delighted with the project delivery.

The photographs show the before and after shots of the plant room and clearly demonstrate the quality of work that CMS delivers.